Update: 3.11.22
GVR maintenance staff have completed a partial demolition on the upper story. The near-term goal is have the upper floor available for member use by the end of the summer.
- Some small interior storage and changing rooms came out along with the old carpet
- The restrooms will be upgraded to ADA standards and lighting will be improved
- The HVAC system has been replaced
- Walls will be repaired and repainted and new flooring will be installed
Walkthrough Video
Gallery